    The Town of Collingwood is seeking to engage the services of an experienced Contractor to construct Phase 2 of the phased implementation of Heritage Park, which is an existing community park in Town of Collingwood, Ontario.

    The works generally includes storm water management features and associated underground infrastructure (within the park and across the Second Street road allowance), lighting, electrical pedestals, and associated electrical infrastructure, asphalt and granular driveway, granular trails, concrete walkways/ sidewalks (for the dog park and along the south side of Second Street), chain-link fencing (for the dog park and existing junior baseball diamond), and planting.


    Stage: Open - Bids/Quotes/Tenders                                    

    Sector: Public

    Project/Bid No.: FIN2018-011

    Project Location: High Street, Collingwood Ontario   

    Project Class: Heavy/Civil

    Industry: Heavy/Highway/Utilities

    Trade: General Roadwork


    Bids Due: April 17, 2018 3:30PM

    Bids Due To: Town of Collingwood


    Detail of Services:

    Heritage Park occupies an entire municipal block bounded by High St., Second St., Spruce St. and Third St. and is home to the Collingwood Fire Hall and the Centennial Pool.

    The following is a general but not necessarily complete description of the Works to be constructed under the Contract:

    1. Erosion control and site protection
    2. Removal & disposal of existing storage building, foundation and interior fixtures
    3. Removal & disposal of fencing, a portion of the existing concrete skate park surface/ features, a portion of the existing asphalt tennis court surfacing, portions of municipal sidewalk, a portion of granular trail, electrical panels and a light pole
    4. Salvaging and relocation of traffic signs
    5. Stripping, earthworks, and rough grading
    6. Removal and replacement of culverts across Second Street incl. restoration
    7. Culverts, catchbasin & area drains
    8. Concrete & granular walkways
    9. Concrete sidewalk & tactile walking surface indicators
    10. Granular & asphalt driveway
    11. Chain-link fencing and gates
    12. Electrical servicing, guy wires, pedestals, and walkway lighting
    13. Planting of trees and shrubs
    14. Topsoil and sodding

      Heritage Park Concept Plan

    Purchasing Department
    Phone: 705-445-1030 ext 3234
    Email: purchasing@collingwood.ca

     

    The work shall begin after September 3, 2018 and completion of the work shall be achieved by May 31, 2019


    DOW's

    Division 02 - Existing Conditions

    Division 03 - Concrete

    Division 10 - Specialties

    Division 26 - Electrical

    Division 31 - Earthwork

    Division 32 - Exterior Improvements

    Division 33 - Utilities

     

    Get your company involved with Hundreds of other Heavy/Highway Projects in Ontario.

     
    Document Takers:
     
    Collingwood Heritage Park Construction - Phase 2 Bidders List
     
    DataBid is currently tracking this project titled "Collingwood Heritage Park Construction - Phase 2" (DataBid ID: 0052031618)
     
    Town-of-Collingwood
     
    JL

    Judy Lamelza

    Editor-in-Chief

    Want More Construction Leads?

    DataBid helps contractors find and win more projects.

    No credit card required